Roofing · 01

Full tear-off, because you can’t inspect a deck you covered up.

Most homes are finished in one to two days. GAF Certified materials, 25-year manufacturer warranty and our own 5-year workmanship guarantee.

What replacement means

Everything comes off first.

Laying new shingles over old hides exactly the thing you’re paying to have fixed. We strip the roof to the deck so the surface underneath gets seen and, where it’s soft, replaced.

01
Tear-off
The complete old system comes off — shingles, underlayment, failed flashing. Debris contained and hauled out, not left in your yard.
Complete tear-off · Debris containment · Haul-away
02
Decking
Soft, rotted or delaminated sheathing gets replaced before anything goes back down. On one job that meant 120 plywood panels.
OSB & plywood inspection · Panel replacement · Fastener pattern
03
The new system
Ice and water shield at the valleys and eaves, synthetic underlayment, starter course, architectural shingles, ridge vent, and counter flashing at every penetration.
Ice & water shield · Synthetic underlayment · 30-year architectural · Ridge vent · Counter flashing
04
Scale
Jobs from 17 squares up past 49. Whole apartment complexes with two crews running at once, building by building, tenants still living there.
17–49+ squares · 10/12 pitch · Multi-building · Tenant-occupied
Underneath

The layers you never see are the ones doing the work.

A roof is a system. Shingles are just the part facing the weather — the underlayment, the ice and water shield and the flashing are what actually keep water out of the structure.

Every one of those layers gets installed to the manufacturer spec, because that spec is what makes the 25-year warranty enforceable.

Ice & water shield · Valleys & eaves · Penetration detailing · GAF Certified decking products

Ice and water shield being applied at a roof valley
Finished

Roofs we’ve replaced.

Real properties across Nashville, Franklin and the surrounding counties.

Completed roof replacement on a brick home
Full replacement
Aerial view of a finished shingle roof
Tear-off & replacement
Aerial view of a completed roof
Architectural shingle
Questions

Worth knowing before you start.

01 How long will my roof replacement project take?
Timeline varies by project size and weather. Most residential homes take one to two days to complete. We provide detailed scheduling during your consultation.
02 Is it possible to install over existing shingles?
We typically recommend full removal to properly inspect and address underlying issues. This ensures better long-term performance.
03 What warranties are included?
Comprehensive manufacturer warranties on materials plus our own workmanship guarantee. For decking we solely use GAF Certified products, and shingles include a 25+ year warranty.
04 How should I prepare my property?
We’ll provide a detailed preparation checklist, but it generally involves clearing driveway access, protecting landscaping and securing outdoor items. Our team handles most of the preparation.
More roofing

The rest of what we do up there.

Find out whether it actually needs replacing.

Free inspection with photo documentation and a written, itemised estimate. If the roof has life left, we’ll say so.

Site by Kestrel